With the extra hours we've been putting in and the new lathe we got earlier this year, we've managed to reduce our wait time to about 6 weeks if we don't have to wait for parts.
We have a bunch of Bartlein and Brux barrels, Lugs, Triggers, bottom metals, Brakes, and we have Mcmillan HTG and A5 flat tops in stock.
We also have a Deviance Deviant magnum Long action(Right Hand).
Even if you don't have all your parts already, we probably have them here or can get them quickly enough to have your build done in under two months. 4-6 weeks if we have all the parts you need.
Give us a call!
Thank you
We have a bunch of Bartlein and Brux barrels, Lugs, Triggers, bottom metals, Brakes, and we have Mcmillan HTG and A5 flat tops in stock.
We also have a Deviance Deviant magnum Long action(Right Hand).
Even if you don't have all your parts already, we probably have them here or can get them quickly enough to have your build done in under two months. 4-6 weeks if we have all the parts you need.
Give us a call!
Thank you