Starlink works for us out in the boonies.View attachment 8151526
Finally got our carriage house started a few weeks ago. Dried in, hvac and electric rough in are done, insulation done. Should be working on drywall and siding this week. Came home from the store and the well contractor has the drill and compressor in the yard. Electric coop set xfmr and meter last week. Septic and propane should be last week or two of June if things go well. Hopefully 4 or 5 weeks from moving in. A year in the fifth wheel isn’t bad, but hard to call it comfortable when a comfortable bed and better environmental controls are so near. Just need a fiber provider to put some cable in nearby and it will be about right.