Was wondering how long you guys let your lathes warm up before going for a dead nuts dial in? My G4003G seems to need a good period of running before I can dial in tenths without constantly chasing it.
I have the same lathe. I indicate cold. Let it run [MENTION=27373]360[/MENTION] for 15 min or so and re- check it. Rarely do I ever have to make an adjustment.