I called and ordered a .187 lug and a couple extractors about 2 weeks ago. Today i called and asked if they had shipped but they said the lug was 2 weeks out. When I asked to change it to a .200 lug (they had in stock) she said they could but would charge me a "change order fee". I wasn't quite sure why as the order had not been processed yet. Is this the norm? I have never ran into this before with them but she mentioned they are a big company now and it takes time to change things out.
Thanks guys,
Casey
Thanks guys,
Casey