I know Mega has discontinued the monolithic upper, but we had this planned before that came down the pipe. Still, the vast majority of it will be relevant to a standard MATEN build.
Part 1 is the introduction. We will install the fire control components in Part 2.
<object width="425" height="350"> <param name="movie" value="http://www.youtube.com/v/Dbkd2ePeIHg&hd=1"></param> <param name="wmode" value="transparent"></param> <embed src="http://www.youtube.com/v/Dbkd2ePeIHg&hd=1" type="application/x-shockwave-flash" wmode="transparent" width="425" height="350"> </embed></object>
HD Video Link
Part 1 is the introduction. We will install the fire control components in Part 2.
<object width="425" height="350"> <param name="movie" value="http://www.youtube.com/v/Dbkd2ePeIHg&hd=1"></param> <param name="wmode" value="transparent"></param> <embed src="http://www.youtube.com/v/Dbkd2ePeIHg&hd=1" type="application/x-shockwave-flash" wmode="transparent" width="425" height="350"> </embed></object>
HD Video Link